Data Migration Project

As the Product Manager, I led the data migration project for a major bank, transitioning data from a legacy database to a new authorized provisioning point. The goal was to ensure a seamless and accurate migration, meeting all business and regulatory requirements while overcoming geographical and time zone challenges.

Challenges

Add a little bit of body text_edited.png
  • International Coordination: Collaborating with the business team operating on European hours while the engineering team was located in the United States.

  • Requirement Gathering: Accurately capturing and translating business needs and regulatory requirements into technical specifications.

  • Data Mapping: Ensuring precise mapping of data from the legacy system to the new database, including formatting and logic.

  • Stakeholder Communication: Maintaining clear and effective communication among diverse stakeholders, including business, engineering, and system tech owners.

​

Solution

To address these challenges, we adopted a Agile approach:

  • Effective Communication: Established clear communication protocols to manage time zone differences and ensure timely updates and feedback.

  • Comprehensive Requirement Gathering: Conducted detailed sessions with the business team to understand their needs, regulatory requirements, and current data usage for reporting.

  • Data Mapping and Logic Implementation: Worked closely with the engineering team to map data accurately from trading systems to the authorized provisioning point, including all necessary formatting and logic.

  • SQL Analysis: Utilized SQL to analyze data in both the legacy database and the new authorized provisioning point database. This helped in identifying discrepancies, mapping data accurately, and determining the necessary logic for migration.

  • Collaborative Implementation: Coordinated with engineers and system tech owners to ensure the data migration met business needs and was delivered on time.

​

Data Processing
Image by Sunder Muthukumaran

My Role

As the Product Manager, my responsibilities included:

  • Requirement Gathering: Collected and documented requirements from the business team, ensuring a thorough understanding of their needs and regulatory obligations.

  • Project Planning and Execution: Developed detailed project plans, managed timelines, and ensured alignment between business requirements and technical implementation.

  • Data Mapping: Defined the data mapping process, including formatting and logic required to transition data from the legacy system to the new database.

  • SQL Analysis: Used SQL to examine data in both the legacy and new databases, facilitating accurate mapping and logical consistency.

  • Stakeholder Coordination: Facilitated communication and collaboration among business, engineering, and system tech teams to ensure smooth execution of the migration.

  • Testing and Validation: Oversaw the testing process to validate the accuracy and integrity of the migrated data, ensuring it met all business and regulatory requirements.

​

Results

  • Successful Data Migration: Completed the migration of data from the legacy database to the new system, meeting all business and regulatory requirements.

  • Enhanced Data Integrity: Ensured accurate data mapping and validation, resulting in high data integrity and reliability.

  • Effective Collaboration: Overcame geographical and time zone challenges to maintain effective communication and collaboration among international teams.

  • Regulatory Compliance: Met all regulatory requirements through meticulous requirement gathering and validation processes.​

Database Migration_edited.jpg

This project demonstrates my ability to leverage SQL and agile methodology to solve complex problems, optimize processes, and deliver tangible results, reflecting the core competencies of a Product Manager.

database-migration-1.webp